Q3 2026 OKRs

ECreated by Elena Vasquez

Objective โ€” Driftline feels instant everywhere

  • โ€ขKR1 โ€” P95 canvas load under 900 ms (today: 1.4 s).
  • โ€ขKR2 โ€” Batch compression cuts storage cost by 30%.
  • โ€ขKR3 โ€” Zero data-loss incidents across the quarter.

Objective โ€” Teams plan launches end-to-end in Driftline

  • โ€ขKR1 โ€” 40% of weekly active teams use launch templates.
  • โ€ขKR2 โ€” NPS on the planning flow reaches +45.
๐Ÿ“ˆ

KRs are graded 0.0โ€“1.0 in the last week of the quarter; 0.7 is a good score.